Afton Driveway Construction

cut in a 700' long driveway and prepare the property for a future house...

The goal of this project was to cut in a 700' long driveway and prepare the property for a future house to be built. The construction driveway is built from two feet thick of 3" minus limestone base rock. This will allow water to drain properly while creating an extremely solid foundation for concrete trucks, semi's and many more vehicles to travel over during the construction process. This will also set up a great sub base for when the final lift of gravel and asphalt are added to the driveway.

Project Details

Excavating

2000+ yards of material moved

Erosion Control

Straw blanket, bio-logs, and rip rap.

Project Gallery